Jobs, tax and power bills

Economic Impact

Do data centres pay Alberta back? Both sides in plain numbers, and who each number comes from.

01The issue

Do data centres pay Alberta back?

Alberta is courting AI data centres hard. The tech minister wants $100 billion of them under construction within five years, and Meta is already building a $13 billion campus in Sturgeon County, north of Edmonton.

Supporters say it is private money, thousands of jobs and new public revenue, with no public money at risk. Critics say the permanent jobs are few, the revenue figure comes with no breakdown, and households may pay through higher power bills. Both sides are mostly quoting the same project and the same numbers. Every argument is below in one line. Open any point for the full record, the sources, and how it works in detail.

The case for 12 points

01ForSourced factBillions in private investmentMeta is putting more than $13 billion into its Sturgeon County campus, and the province says not one public dollar went in.$13B+Meta, Sturgeon County

In plain English

This is company money, not tax money. If the project fails, the company loses, not the province.

What this means for Alberta families

No tax dollars are at risk on this project, by the province's account. Families feel it through the jobs, taxes and power-bill effects in the other points, not through the investment itself.

The record

Meta: "Once complete, our Sturgeon County data center will represent an investment of more than CAD $13 billion." The campus is about one gigawatt.

Beside it, the Greenlight gas power plant: 932 MW, a capital cost of "approximately $4 billion", about $4.6 billion including financing costs, owned by Pembina Pipeline, Morgan Stanley Infrastructure Partners and Kineticor. It is expected in service in the second half of 2030.

The province: "Alberta is contributing no subsidy, no grant, no discounted power and no guarantee."

For professionals

  • Committed versus announced: Meta and Greenlight have both taken final investment decisions. Our arithmetic: together they come to about $17.6 billion, roughly one-sixth of the province's $100 billion five-year goal.
  • Greenlight's $4.6 billion includes $0.6 billion of interest during construction and other financing costs. Pembina Pipeline expects the plant to earn about $310 million a year in adjusted EBITDA for its 47.5% share.
  • No subsidy is a real difference from the US. Virginia's sales-tax exemption for data centres was worth $928.6 million in fiscal 2023 alone, by far the state's largest economic-development incentive, according to its legislative auditor. Alberta has no sales tax to exempt, and the province says it offered no grant or discount.

What the other side says

One project is not a boom. See "A target is not an investment".

What would settle it

Whether the other proposals reach a final investment decision. Most have no grid power allocated yet.

Sources 6105264

02ForInterested partyMoney back to Albertans every yearThe province counts about $250 million a year from this one project, in royalties, taxes, a levy and lower transmission fees.$250M/yrthe province's count

In plain English

The province says this one project sends about a quarter of a billion dollars a year back to Albertans, without raising anyone's taxes.

What this means for Alberta families

The province says this money helps pay for healthcare, education and public safety without raising your taxes. How much of it is new tax money, rather than grid fees, it hasn't said.

The record

The province: "The Meta project alone is expected to deliver roughly $250 million a year in benefits to Albertans through royalties, taxes, levies and transmission fees. Revenue on that scale helps pay for healthcare, education and public safety without raising your taxes."

Four channels, as the province lists them. Royalties: on the natural gas the power plant burns, "roughly 150 million cubic feet every day." The levy: "up to 2 per cent on the value of their computing equipment." Property tax: "Sturgeon County's mayor has estimated the Meta project will contribute upwards of $40 million in additional property tax revenue per year." Lower grid costs: the transmission part of household bills "is expected to drop by up to 6 per cent."

The province does not put a dollar figure on any single channel.

For professionals

  • Transmission fees may be most of it. The province's own "by the numbers" page puts Meta's transmission fees at about $196.8 million a year (970 MW, 90% load factor). The province hasn't said whether that sits inside the $250 million. If it does, our arithmetic: royalties, taxes and the levy together come to roughly $53 million a year. Transmission fees are what any large industrial customer pays for grid service. They lower everyone else's share of the grid, but they aren't tax revenue.
  • The levy (Alberta Corporate Tax Act, via Bill 12, 2025) applies to data centres of 75 MW or more. It is charged on 45% of the cost of computing equipment under four years old and 15% of older equipment, at a rate between 1% and 2% depending on how much power the site draws from the grid. Power not drawn from the grid is set to qualify for a zero rate.
  • The levy is "fully deductible against a data centre's corporate income taxes." For a profitable operator it largely offsets corporate tax it would pay anyway. For one without enough Alberta corporate tax, the credit isn't refundable and can expire unused after seven years, so it becomes "effectively... a final tax". Either way, it works more like a minimum tax than an added one.
  • Province-wide, Budget 2026 books $102 million from the levy, starting in 2028-29.
  • Property tax excludes the most valuable part. "The computing equipment is not subject to assessment," and it "can represent the majority of the cost of development." Only land, buildings, cooling and electrical systems, and power generation are taxed. The rural municipalities' association says this "greatly reduces the potential tax revenue."
  • The counting is unclear. The province's page lists the $40 million of property tax separately from the $250 million. The Pembina Institute reads the same figures as $210 million to the province plus $40 million in property tax, $250 million in total.
  • It is not a royalty on the data centre. Albertans are used to royalties on a resource the province owns. A data centre sells computing, so the only royalty is on the gas its power plant burns.

What the other side says

The province hasn't published a breakdown or a method. See "The $250 million comes with no breakdown".

What would settle it

The province publishing the $250 million line by line: royalties, levy, corporate tax, property tax and grid savings, each with its assumptions.

Sources 10196259606146

03ForSourced factThousands of construction jobsMore than 3,000 tradespeople at the peak of construction on Meta's campus alone.3,000+construction jobs at peak

In plain English

Building it is a big job for Alberta's trades: electricians, pipefitters, crane operators and concrete crews.

What this means for Alberta families

If someone in your household works in the trades, this is years of work near Edmonton. Near the site, thousands of workers also means more traffic and more pressure on housing and local services while it's being built.

The record

Meta: "We anticipate approximately 3,000 construction workers will be onsite at the peak of construction."

The province calls data centre construction potentially "one of the largest sources of trades work in the province for the next decade."

The Greenlight power plant adds more. The province's release says "about 1,000 good-paying construction jobs"; the province's Major Projects register says "about 1,500 workers at the peak of construction." The two government sources disagree.

For professionals

  • "At peak" is the busiest point of the build, not the average across it. No source we found gives total worker-years for Meta's campus. For Greenlight, Kineticor gives "almost 9,000,000 worker-hours in the local area."

What the other side says

Construction jobs end when construction ends. See "Most of the jobs are temporary".

What would settle it

A construction-phase agreement with the host municipality covering roads, housing and emergency services. None has been published.

Sources 6105657

04ForInterested partyGood permanent jobs outside oil and gasThe province says the 300+ long-term jobs are well-paid careers that an energy downturn doesn't touch.300+long-term jobs, Meta

In plain English

Fewer jobs than the build, but the province says they're steady, well-paid and not tied to oil prices.

What this means for Alberta families

About 300 people get a long-term job that doesn't rise and fall with oil prices, by the province's account. For most families, the effect is indirect.

The record

Meta: the campus "will support more than 300 operational jobs."

The province: "high-paying, mortgage-paying careers: technicians, network engineers, electricians, security and facilities staff. They sit outside the oil and gas cycle, so an energy downturn does not touch them." And: "Three hundred good jobs at zero cost to taxpayers is a clear win, and that's only the direct jobs."

The minister at the Aug. 21 town hall: "If we have a choice between 300 jobs and zero jobs, I'm taking 300 jobs all day long," adding that the development creates "orders of magnitude more jobs that are supporting that supply chain."

For professionals

  • The province names supply-chain companies (CoolIT Systems, Silent-Aire, Denvr and CES Corporation) and points to servicing and replacing equipment "on cycles of just a few years." The province gives no number for the indirect jobs.
  • The only Alberta multiplier estimate we found is a University of Calgary graduate student's capstone, not peer-reviewed. For a 100 MW facility it models about 50 full-time jobs on site and "more than 500 jobs across Alberta" in operation.
  • Virginia, the world's largest data-centre market, found that most facilities employ fewer than 50 people once running, and that "data centers provide economic benefits, mostly during their initial construction."

What the other side says

300 jobs for $13 billion is about $43 million per job. See "Most of the jobs are temporary".

What would settle it

An independent count of indirect jobs, and local-hire commitments in writing.

Sources 610116564

05ForInterested partyIt brings its own power and pays its wayLarge data centres must pay for their own grid connection and new generation, and the transmission part of your bill goes down.Up to 6%lower transmission charges

In plain English

The province says the data centre pays for its own power plant and its own connection, and because it shares the grid's fixed costs, everyone else's share shrinks.

What this means for Alberta families

If it works as the province says, the transmission part of your power bill goes down, by up to 6%. That's one part of the bill. The energy part can move the other way: see "Power bills could rise first".

The record

The province: "Alberta requires large data centres to bring their own power, pay for the infrastructure needed to support their operations and meet strict environmental and water requirements."

Meta: "We pay the full costs of our data centers' energy use so consumers aren't negatively impacted, and fund new and upgraded infrastructure."

The province: "The transmission portion of household bills is expected to drop by up to 6 per cent from the Meta project's fees alone." The Pembina Institute agrees with that part: under $20 a year for the average household.

For professionals

  • Tethering, where a data centre brings generation at least equal to its peak demand, is optional under the Data Centre Regulation (Alta Reg 117/2026, ss. 5, 6, 8). Opting in buys a faster place in the connection queue.
  • A "bridged" site can draw grid power for up to three years while its plant is built (s. 9), and bridged sites are the first to be cut when supply is short (s. 10).
  • Under the grid operator's tariff (ISO Tariff s. 4), a customer pays a "construction contribution" for its connection, less a "local investment" funded by all ratepayers and capped by its contracted capacity. System-wide upgrades are spread across everyone's rates. So "pays its own connection" is broadly true, but not 100%.
  • The grid operator itself lists as an open question for Phase 2: "Are large loads paying their fair share of transmission costs?"

What the other side says

The transmission saving is real but small, and the energy price rises before the gas plant arrives. See "Power bills could rise first".

What would settle it

Who pays for bulk grid upgrades, which is still being decided in the grid operator's Phase 2 large-load process.

Sources 10196464463

06ForSourced factInfrastructure that staysPower plants, fibre, and about $60 million of roads and water upgrades stay in Alberta whatever happens to the project.$60Mlocal roads and water, Meta

In plain English

Even if the company leaves, what it built stays.

What this means for Alberta families

The roads and water upgrades near the site keep serving local residents whatever happens to the data centre.

The record

Meta: "We're also investing approximately CAD $60 million in local infrastructure improvements that will benefit the local community, including roads and water infrastructure," plus annual Community Action Grants for local non-profits.

The province: "Albertans keep every dollar of tax and royalty already paid, and everything already built stays right here: the buildings, the power plants, the fibre optic lines and the grid upgrades."

For professionals

  • "Including" means roads and water are examples. No breakdown of the $60 million has been published.

What the other side says

What stays can be an asset or a liability. See "The risk doesn't end when it closes".

What would settle it

Whether a buyer or reuse plan exists for the site and the plant if the tenant leaves.

Sources 610

07ForSourced factNew demand for Alberta gasThe power plant will burn about 150 million cubic feet of Alberta natural gas a day, and royalties flow on every cubic foot produced.150M ft³/daynew gas demand, Greenlight

In plain English

Alberta has more gas than buyers, and prices are low. A big new local customer helps producers, and royalties go to the province.

What this means for Alberta families

Families who work in gas production get a big new local buyer. For everyone else, the benefit comes through royalties to the province, which stay small while gas prices are low.

The record

Pembina Pipeline: Greenlight "will require approximately 150 million cubic feet per day of natural gas."

The province: "Data centre power plants run on Alberta natural gas... new demand for a resource Albertans own, with royalties flowing to the province when it is produced."

Alberta's own reference price for gas was $1.35 per gigajoule in July 2026, down from $2.46 in January.

For professionals

  • Our arithmetic, at July 2026 prices: 150 million cubic feet a day is about 160,600 GJ a day (using the conversion in Greenlight's own federal filing), worth roughly $79 million a year at $1.35/GJ. Royalties are a share of that value, not the whole of it.
  • The royalty rate under the Modernized Royalty Framework: "a flat royalty of 5% on a well's early production" until the well has paid out, then a formula-driven rate with "a minimum of 5% and a maximum of 40%." When prices are low, the rate sits near the bottom of that range.
  • So at today's prices, the gas royalty is likely a small part of the $250 million. It rises if gas prices rise. We have not found a provincial estimate of this royalty that we can confirm.

What the other side says

Low gas prices mean low royalties, and the gas plant's emissions carry a carbon cost. See "The carbon bill".

What would settle it

The province publishing its royalty estimate for data-centre gas demand, with the price assumption behind it.

Sources 5210787479

08ForSourced factFirst Nations can own a shareOne Alberta project is 51% owned by a First Nation. That model exists, though not on Meta's campus or its power plant.51%Woodland Cree ownership, one project

In plain English

Data centres can be built as partnerships where a First Nation owns part of the project and shares in the profit, not just the jobs.

What this means for Alberta families

For First Nations families, ownership means a share of the profit for as long as the project runs, not only jobs while it's built. For now that's one proposed project, not the big one.

The record

Mihta Askiy Datacenter LP is 51% owned by Woodland Cree First Nation, with 650 MW of on-site gas power. The tech minister: "With 51 per cent Indigenous ownership, this project represents a meaningful step forward in reconciliation and economic partnership."

Meta's campus and the Greenlight plant disclose no Indigenous ownership. Greenlight is owned by Pembina (47.5%), Morgan Stanley Infrastructure Partners (47.5%) and Kineticor (5%). Its federal filing lists 18 Indigenous groups to be engaged and consulted.

Wonder Valley has no equity partner and is being challenged in court by the Sturgeon Lake Cree Nation.

For professionals

  • The Alberta Indigenous Opportunities Corporation offers a $3 billion loan-guarantee program (guarantees of $20 million to $250 million). We found no guarantee issued for a data-centre project.

What the other side says

Consultation and ownership are different things. The biggest project has neither ownership nor a published benefit agreement.

What would settle it

Whether equity partnership becomes a condition of approval, or stays optional.

Sources 80527423

09ForSourced factThe waste heat could be soldMeta already heats about 9,000 homes in Denmark with a data centre's waste heat. Stockholm pays data centres for theirs. Sturgeon has no such plan yet.~9,000homes heated by Meta in Odense

In plain English

A data centre turns almost all its power into heat. Elsewhere that heat warms homes and earns money. Here, so far, it goes into the air.

What this means for Alberta families

In Denmark, about 9,000 homes are heated this way. No Alberta project has committed to it, so for families here it's a possibility, not something on the way.

The record

Meta, Odense, Denmark: "165,000 megawatt hours of free surplus heat from the data centre's server halls is delivered to the local district heating system... to up to ~9,000 households."

Stockholm's heat utility pays data centres "approximately €190,000 per year per MW of heat delivered," priced on what that heat would have cost to produce another way.

Alberta's AI Data Centre Strategy says only that the province "will explore innovative ways of capturing and utilizing the heat." Meta's Sturgeon announcements don't mention heat reuse.

For professionals

  • Stockholm's model: the data centre pays for its own heat pumps, and the utility builds the connection, which the data centre repays monthly over 15 years.
  • Heat reuse needs a heat customer nearby: a district heating network, greenhouses or industry. The EU requires data centres over 1 MW to reuse waste heat unless a cost-benefit analysis shows it's not feasible. Germany sets reuse minimums for new data centres.

What the other side says

It's a potential benefit, not a planned one. No Alberta project has committed to heat reuse.

What would settle it

A heat-reuse commitment written into approvals, and a heat customer near the site.

Sources 91383637

10ForEstimateData centres can ease off when the grid is tightResearch finds a grid can take on far more data-centre load if it can be cut back for a few hours a year. Alberta's rules already cut data centres first.0.25%of hours curtailed, per Duke study

In plain English

If a data centre can dial down during the few hours a year when power is scarce, it needs less new supply and does less to push up prices.

What this means for Alberta families

If data centres cut back in the few tight hours a year, they put less pressure on the prices your household pays. That only helps if it's written into contracts and actually used, which isn't settled yet.

The record

Duke University's Nicholas Institute (2025): across the US, "76 GW of new load... could be integrated with an average annual load curtailment rate of 0.25%," with curtailments averaging 1.7 hours.

Google has "signed 1 GW of data center demand response with utility partners," including by shifting machine-learning workloads.

Alberta's Data Centre Regulation already requires the grid operator to cut bridged data centres first when supply is short, and all large data centres first in mandatory load shedding (s. 10).

For professionals

  • The grid operator's connection guide for data centres: after a contingency it will restore limits "in 30 minutes or less," which "may include curtailment or shedding" of data-centre load.
  • Being cut first protects reliability. It doesn't by itself lower prices. That depends on whether data centres cut back when prices are high, which is voluntary unless it's in their contracts.
  • We haven't found whether Meta's grid contract includes curtailment terms.

What the other side says

Meta's 970 MW is a firm grid allocation, not a bridged load. Flexibility helps only if it's actually used when prices spike.

What would settle it

Price-responsive curtailment written into large-load contracts, and data from the first years of operation.

Sources 92934494

11ForSourced factTough rules didn't scare investment awayOhio made data centres commit to paying for their power and still signed 5,642 MW. Places that made them pay more or wait still got built.5,642 MWsigned in Ohio under tougher terms

In plain English

Alberta doesn't have to choose between protecting ratepayers and attracting data centres. Other places did both.

What this means for Alberta families

Rules that make data centres pay their own way protect household bills, and other places show those rules don't have to drive investment away. What Alberta adopts is still being decided.

The record

Ohio: before its data-centre tariff, developers had requested 30,000 MW. Under the tariff (85% minimum take, 12 years, exit fee), they signed binding contracts for 5,642 MW, on top of 12,219 MW signed before it: 17,861 MW in total.

Québec charges new data centres an average of about 13¢/kWh, "about double" the large-industry rate, and allocates power case by case on economic, social and environmental benefit.

Singapore paused new data centres, then reopened with conditions. Demand exceeded what it offered: more than 20 proposals for 200 MW.

For professionals

  • What tougher rules removed was speculation. Ohio's tariff shrank a 30,000 MW queue of requests, not the projects that were real. Alberta's queue is over 20,000 MW against about 13,000 MW of peak demand.
  • Georgia's PSC allows contracts with upfront infrastructure payments and financial guarantees. Its data-centre pipeline shrank from 56.9 GW to 50.9 GW while committed customers grew.

What the other side says

Those markets have other advantages (fibre, customers, cheap or clean power). Alberta competes on price and speed, and tougher terms blunt both.

What would settle it

What Alberta adopts in the grid operator's Phase 2 large-load framework, due to start taking applications this fall.

Sources 9531869697

12ForInterested partyA big customer spreads the grid's costsMeta will pay about $197 million a year in transmission fees. Capital Power says that saves more than $1 billion in system-wide transmission costs over eight years.$1B+transmission savings over 8 years, Capital Power's claim

In plain English

The grid's poles and wires cost the same whether one customer uses them or many. A very large new customer pays a big share, so everyone else pays a bit less.

What this means for Alberta families

A big customer carrying more of the grid's fixed costs means a smaller share for your household. Whether that shows up as a lower bill depends on what energy prices do at the same time.

The record

The province: Meta's transmission fees are about $196.8 million a year, "estimated at 970 MW of demand transmission service (DTS), 90 per cent load factor."

The province: "Large customers paying full freight shrink everyone else's share of the fixed costs of the grid." The transmission part of household bills is "expected to drop by up to 6 per cent."

Capital Power, in a federal submission as reported by Canada's National Observer: the data centre "would save over $1 billion in 'system-wide' transmission costs over eight years."

For professionals

  • Most of that saving goes to the customers who buy most of the power. Industrial, commercial and farm customers use about 87% of it, so households get a fraction.
  • Pembina's backgrounder puts the household share at about $13 a year on average, up to $29 before the gas plant starts. The saving is real; the argument is about whether higher energy prices outweigh it.

What the other side says

The Pembina Institute: the transmission savings "are likely to be more than offset by higher energy prices." See "Power bills could rise first".

What would settle it

The grid operator's Phase 2 decision on whether large loads pay their "fair share of transmission costs."

Sources 621089884663

The case against 13 points

01AgainstSourced factMost of the jobs are temporaryMore than 3,000 at the peak of the build, about 300 once it's running. The gas plant beside it adds 30.300+jobs that stay

In plain English

The build is big. What's left once it's running is small for a project this size.

What this means for Alberta families

For a trades family the work is real, but it has an end date. Once the campus runs, about 300 jobs remain, so for most families the long-term job effect is small.

The record

Meta: about 3,000 construction workers at peak, "more than 300 operational jobs" once running.

Greenlight, the gas plant beside it: "30 long-term skilled positions", per the province's release.

Our arithmetic: $13 billion divided by 300 jobs is about $43 million of investment per permanent job.

At the Aug. 21 town hall, "multiple speakers questioned whether 300 permanent jobs were worth all the concerns."

For professionals

  • Capital per job is the wrong yardstick for a data centre on its own. It's a capital-heavy business by design. The fair question is the public return per dollar, which is the $250 million question.
  • Per megawatt, the project that's actually building promises the fewest jobs. Our arithmetic from each proponent's own figures: Meta states about 30 permanent jobs per 100 MW. The proposed projects claim more: Beacon Foothills 75, Synapse 100+. A smaller colocation site that's building, eStruxture, states 50 to 56. Promises made before construction deserve a discount. See the project table.

What the other side says

The province: "Three hundred good jobs at zero cost to taxpayers is a clear win." See "Good permanent jobs outside oil and gas".

What would settle it

An independent count of the supply-chain jobs the province says follow.

Sources 65611

02AgainstSourced factThe $250 million comes with no breakdownThe province's own figure, with no split by source and no published method.No breakdownof the $250M

In plain English

It may well be right. But nobody outside government can check it yet.

What this means for Alberta families

The number most often quoted about what families get back can't be checked yet. Until the province publishes a breakdown, treat it as the province's own estimate.

The record

The province's page lists four sources of the $250 million (royalties, taxes, a levy and transmission fees) but gives no dollar amount for any of them.

It is the province's figure, not Meta's. Meta's own announcement contains no revenue figure.

Part of it isn't money to government at all: the lower transmission charges on household bills are counted inside it.

For professionals

  • The province's own figures put Meta's transmission fees at about $196.8 million a year. If that is inside the $250 million, the royalties, taxes and levy come to roughly $53 million a year (our arithmetic). The province hasn't said either way.
  • The levy is fully deductible against Alberta corporate income tax, so its net addition depends on how much corporate tax the operator pays in Alberta. That isn't public. Province-wide, Budget 2026 expects $102 million from the levy in 2028-29.
  • The computing equipment, usually most of a data centre's cost, is exempt from municipal property tax.
  • The province's page and the Pembina Institute's backgrounder disagree on whether the $40 million of county property tax is inside the $250 million or on top of it. And the $40 million is the mayor's estimate, not an assessment.

What the other side says

The province says the benefits are "real" and flow through four named channels. See "Money back to Albertans every year".

What would settle it

A line-by-line breakdown from the province, with assumptions.

Sources 10662596146

03AgainstEstimatePower bills could rise firstThe Pembina Institute estimates the average household could pay $267 to $462 more a year from 2027 to 2031.$267–462/yrper household, estimate

In plain English

Until the data centre's own gas plant is running, it draws on the same grid you do, and the Pembina Institute expects that to push power prices up.

What this means for Alberta families

On a typical bill of about $1,700 a year, Pembina's estimate works out to 15% to 25% more, and it varies by provider and rate plan. It's an estimate, and Meta says consumers won't be hurt. Actual bills from 2027 on will settle it.

The record

The Pembina Institute: an average household "could pay between $267 and $462 more per year between 2027 and 2031 as a result of the Meta data centre. This means Albertans may be paying 15% to 25% more for their electricity in the next five years."

Why: "For at least the first year of operations, the data centre will rely solely on Alberta's grid for electricity, using almost as much power as Calgary." The Greenlight plant is due in the second half of 2030.

For scale, the average Alberta household spent "approximately $1,700 on electricity" in 2025.

It's an estimate. Pembina says impacts "will vary depending on each household's electricity provider and rate plan."

For professionals

  • Both sides are right about different parts of the bill. Pembina's backgrounder: transmission charges fall "about $13 per household per year" on average (up to $29 before Greenlight starts), while energy charges rise "about $282 to $477 per household per year, depending on how often the data centre is operating during peak demand hours." Our arithmetic: $282 minus $13 is about $267, and $477 minus $13 is about $462. That is the headline range.
  • Pembina's mechanism: the rules "require new data centres to pay the full cost of their grid connection and build new power infrastructure, [but] they don't protect consumers from the higher rates caused by increased electricity demand before that new supply comes online."
  • Assumptions: only transmission and energy charges change; distribution and other costs are held constant.
  • Independent support: Alberta's Market Surveillance Administrator says Q2 2026 increases in 2029 and 2030 forward prices "were largely driven by data centre developments." The market prices 2030 power at about $83/MWh, against a 2025 average of $43.68. See "Businesses pay the higher prices too".

What the other side says

Meta: "We pay the full costs of our data centers' energy use so consumers aren't negatively impacted." The province counts the transmission saving as a benefit.

What would settle it

Actual bills from 2027 on, compared with the estimate. And whether Alberta adopts rules like Ohio's (85% minimum take, 12-year term, exit fee) or Kansas's (80% minimum bill, two years of collateral).

Sources 4652313287

04AgainstSourced factA target is not an investmentThe $100 billion is the tech minister's five-year hope. Only one large project is funded and building.$100Ba minister's goal, not committed

In plain English

Announcements are cheap. What counts is money actually spent, and so far that's mostly one project.

What this means for Alberta families

Only one project's money is actually being spent. Anything promised to families on the strength of the full $100 billion is a goal, not a commitment.

The record

The goal is Technology Minister Nate Glubish's, from December 2024: he was "hoping to see $100 billion worth of artificial intelligence data centres under construction within the next five years." It does not appear in the province's AI Data Centre Strategy document itself.

Power, not money, is the limit. The grid operator's interim 1,200 MW cap on new large loads is fully allocated to two projects, against 16 to 21 GW of requests, which is more than Alberta's entire peak demand of about 12 GW.

For professionals

  • About 970 MW of the cap went to the Pembina/Meta route and about 230 MW to TransAlta Keephills, leaving about 37 other proposals to find power off-grid.

What the other side says

The province says private investors carry all the risk, so an unbuilt project costs Albertans nothing.

What would settle it

A public tally of final investment decisions, not announcements.

Sources 5851324

05AgainstSourced factThe risk doesn't end when it closesServers are replaced every few years and the gas plant is built for decades. No decommissioning bond is required by default.No bondrequired by default

In plain English

If the tenant leaves, someone has to deal with what's left. Alberta has seen that with oil sands cleanup.

What this means for Alberta families

If a site is abandoned and no bond was posted, the cleanup can fall to the public, and so to taxpayers. A bond posted up front puts that cost on the builder instead.

The record

The province: "when any facility reaches the end of its life, the company that built it is responsible for decommissioning it"; regulators can require financial security.

Data-centre equipment is typically replaced every 3 to 5 years, and abandoned hyperscale sites are hard to repurpose. Greenlight's federal assessment assumes operation for "at least 40 years."

Alberta's track record: the province holds "$1.8 billion in security for oil sands mines, compared to an estimated reclamation liability of $51.9 billion."

For professionals

  • The Data Centre Regulation must be reviewed by May 31, 2030 and expires May 31, 2035 (s. 12).
  • US counties now require security before construction: Susquehanna County, PA, net decommissioning cost plus 10%; Mifflin County, PA, at least 100%, re-estimated every ten years; Henry County, VA, reviewed every three years.

What the other side says

The province: private investors "carry 100 per cent of the risk," and what's built stays in Alberta.

What would settle it

A decommissioning bond posted before construction.

Sources 5027534344394041

06AgainstOpen questionNobody independent has checked the mathWe have found no independent, published cost-benefit study of data centres in Alberta.No studyindependent, published

In plain English

The benefit numbers come from the province and the company. The cost numbers come from one think tank. Nobody neutral has put them side by side.

What this means for Alberta families

Families are being told this is a good deal, and warned it's a bad one, by people with a stake either way. Nobody neutral has checked the math yet.

The record

What exists is one-sided. The Pembina Institute's August 2026 work measures the cost to power bills only. A University of Calgary student capstone models the benefits only. Nothing published sets revenue against ratepayer and infrastructure costs.

At the Aug. 21 town hall, a resident called for a "cost-benefit analysis that takes everything into account collectively, including job loss from the expansion of AI, job loss from environmental destruction, increasing power costs and water distribution costs."

A University of Calgary researcher told CBC that communities "aren't sure of the economic benefit it will bring, the jobs it will produce, and exactly how those benefits will weigh with the possible risks."

For professionals

  • The one comparison that would settle most of this: the $250 million a year against the total yearly cost to all Alberta households of the bill increase. Both are annual dollar figures. It needs a sourced household count and a check of Pembina's method, and we won't publish it until it has both.

What the other side says

The province says the benefits are "real" and names where they come from.

What would settle it

An independent benefit study before any public incentive, paid for by someone without a stake in the answer.

Sources 114665

07AgainstOpen questionNobody knows where the profit is taxedMeta's Canadian ad sales are contracted with its US parent. How much taxable profit, if any, the Alberta campus books here isn't public.UnknownAlberta corporate tax from the campus

In plain English

A data centre makes money for the company that sells the ads, and that may not be the company in Alberta. If little profit is booked here, little corporate tax is paid here.

What this means for Alberta families

If little profit is booked in Alberta, less corporate tax reaches provincial services than the headlines suggest. Nobody outside the company knows how much yet.

The record

Meta's advertising terms: for advertisers in the US and Canada, the contracting company is "Meta Platforms, Inc.", the US parent. The province's Major Projects register lists the campus's proponent as "Meta Platforms Inc."

Alberta's general corporate income tax rate is 8%. The data centre levy is fully deductible against it.

We found no public figure, from Meta or anyone else, for corporate income tax Meta pays in Canada or Alberta.

For professionals

  • How a data centre's income is split between countries is set by intercompany agreements that aren't public. Where a data centre is paid a service fee rather than a share of the ad revenue, little profit stays where the servers sit. We don't know which model Meta uses here.
  • This is why the levy matters. If the Alberta operation books little profit, the levy becomes the tax floor: its credit can't be refunded and can expire unused.
  • Canada's Global Minimum Tax Act sets a 15% minimum rate on large multinationals' profits in each country, but only on profit that is booked in Canada. Meta expects its 2026 effective tax rate to be 13 to 16% worldwide.

What the other side says

The province counts corporate tax as one of the four channels in its $250 million, but it hasn't said how much.

What would settle it

Meta disclosing the Alberta operation's taxable income, or the province publishing expected corporate tax as its own line in the $250 million.

Sources 666770606968

08AgainstInterested partyOne taxpayer, a big slice of the countyThe mayor's $40 million a year estimate would equal about 38% of everything Sturgeon County raised in municipal property tax in 2025.~38%of the county's 2025 levy (our arithmetic)

In plain English

A windfall for the county, and also a dependency. When one company pays a large share of the bills, it gets harder for council to say no to it later.

What this means for Alberta families

For Sturgeon County families, it's a big new source of local tax money that can pay for services or ease the load on other taxpayers. It also leaves the county's budget leaning heavily on one company.

The record

Sturgeon County's 2025 tax bylaw: about $104 million in total general municipal levy, of which about $85.5 million came from non-residential and machinery-and-equipment property.

The mayor estimated the Meta project could bring "upwards of $40 million per year in tax revenue for Sturgeon County" (as paraphrased by the St. Albert Gazette). It's an estimate, not an assessment. The county's own releases give no figure.

Our arithmetic: $40 million divided by about $104 million is about 38%.

The risk is real, not hypothetical. The county was told in 2025 that a property assessment appeal on one heavy industrial property "could reduce the annual tax revenue by up to $20 million."

For professionals

  • Large data centres are designated industrial property, assessed by the province, not the county. The computing equipment is exempt from assessment, so the tax base is the land, buildings, building systems and power generation.

What the other side says

The county: the project brings "long-term tax revenue" and helps "diversify our tax base."

What would settle it

The province's actual assessment of the campus once it's built, and whether it's appealed.

Sources 727361

09AgainstEstimateThe carbon billThe gas plant's emissions intensity is above Alberta's benchmark for power plants, so it will owe carbon payments. Who ends up paying them isn't public.348 kg/MWhGreenlight's stated intensity

In plain English

Burning gas for the campus adds emissions, and Alberta charges industry for emissions above a benchmark. That cost goes somewhere.

What this means for Alberta families

Someone pays the carbon cost, and the contract terms that decide who aren't public. Until they are, whether any of it reaches your power bill is an open question.

The record

Greenlight's federal filing: an intensity of 348 kg of CO2e per MWh. The filing's total, 5,677 kilotonnes a year, is for the full 1,864 MW build-out running every hour of the year. The plant approved so far is half that size.

The Pembina Institute estimates the approved plant "would emit 3 megatonnes of CO2... equivalent to 10% of Alberta's total electricity sector emissions." No method was published.

Alberta's benchmark for power plants under its industrial carbon system (TIER) is 0.3404 tonnes per MWh in 2026, falling 2% a year. Plants above the benchmark pay for the difference.

The TIER price was frozen at $95 a tonne in 2025. Under the May 2026 Canada–Alberta agreement it reaches $115 by 2030 and $130 by 2035.

For professionals

  • Greenlight's 348 kg/MWh sits above the benchmark and the gap widens every year as the benchmark falls. We haven't computed the payment; it depends on how much the plant actually runs.
  • Greenlight is the regulated facility. Whether its carbon cost passes to Meta under their supply contract isn't public.
  • Carbon capture "is not currently part of the project"; the owners "will decide upon design and implementation of CCS at a future date."

What the other side says

Meta says it will add enough clean energy to the Alberta grid to match 100% of the campus's electricity use.

What would settle it

Greenlight's actual output and emissions once running, and the contract terms on who pays compliance costs.

Sources 7483757776

10AgainstOpen questionGrid space for data centres isn't available to other industryAlberta's scarce new grid capacity went first to data centres. Industrial users worry about being treated the same way, and Québec picks projects on benefit per megawatt instead.1,200 MWinterim cap, all to data centres

In plain English

The grid can only take so much new load at once. Every megawatt given to a data centre isn't there for a plant that might employ more people.

What this means for Alberta families

Grid space given to a data centre isn't available to a plant that might employ more people in your town. How Alberta hands out the next round of capacity decides which jobs get built.

The record

All 1,200 MW of the interim cap went to two data-centre projects. The grid operator: "there are other large loads requesting service that need to be accounted for in a long-term framework."

Industrial power users told the grid operator they don't want data-centre rules applied to them. Petrochemicals, refineries and mines "generally exhibit fundamentally different operating characteristics than data centres" (industrial consumers' association). AltaLink warned that requiring industry to bring its own generation "could create significant barriers to investment."

For comparison: Dow's Path2Zero plant in Fort Saskatchewan is $10.1 billion for about 400 to 500 permanent jobs, and it supplies much of its own power. Meta's campus is $13 billion+ for 300+.

For professionals

  • Québec doesn't allocate first-come, first-served. The minister weighs "the economic benefits and social and environmental impacts" of each request of 5 MW or more and can attach conditions. In its first round, 11 of 21 projects were accepted: 956 MW out of 2,671 MW requested.
  • We haven't found any named non-data-centre project in Alberta that is waiting behind data centres for grid access. The concern is about future allocation in Phase 2, not a documented case.

What the other side says

Data centres brought the money and the generation to the table first. Nobody else was ready to take the capacity.

What would settle it

Whether Phase 2 allocates capacity by benefit, first-come, or who brings their own power.

Sources 63848586

11AgainstEstimateBusinesses pay the higher prices tooThe market prices 2030 power at about $83/MWh, nearly double 2025's average. Alberta's market watchdog links the 2029 and 2030 increases largely to data centres. Households use only 13% of the power.$83/MWh2030 forward price, vs $43.68 in 2025

In plain English

The household bill estimate is only part of it. Most of Alberta's power is bought by industry, businesses and farms, and they face the same market.

What this means for Alberta families

Higher power prices for businesses and farms can show up in what families pay for goods and services, not only on the household power bill. Nobody has estimated that cost.

The record

The Market Surveillance Administrator (Q2 2026): "the price of Cal 28 increased by 7% to $62.95/MWh, Cal 29 increased by 18% to $75.25/MWh, and Cal 30 increased by 25% to $83.00/MWh. The price increases for Cal 29 and Cal 30 were largely driven by data centre developments."

When Meta's campus was announced on July 8, 2026, "forward prices for the second half of 2028 increased by 5%."

For comparison: the average pool price in 2025 was $43.68/MWh, the lowest in eight years, and the 2027 contract traded at $46.55 on June 30, 2026. Our arithmetic: $83.00 is about 1.9 times the 2025 average.

Who buys Alberta's power: industrial customers about 65%, commercial about 20%, residential 13%, farms 3% (grid operator, 2020).

Pembina's $267 to $462 estimate covers households only. We found no estimate of the cost to businesses or the whole market.

For professionals

  • Illustration only, our arithmetic: Alberta used 90,371 GWh in 2025. Every $10/MWh on that is about $900 million a year, if it were fully passed through. Much industrial load is self-supplied or hedged, so the real figure is lower. Nobody has published it.
  • Generators benefit. As reported by Canada's National Observer, Capital Power's investor materials say every $10/MWh rise in Alberta prices adds about $140 million a year to its Alberta plants' earnings.
  • Forward prices swing. In late January and early February 2026 they fell about 20%, partly from "pessimism around future data centre load," then recovered in Q2. The 2030 contract was $83.25 in mid-January and $83.00 on June 30. They're a market signal, not a forecast.
  • The watchdog says longer-dated contracts trade "based on the REM and the potential for data centre loads": Alberta's Restructured Energy Market, due in 2028, also moves these prices. Not all of the rise is data centres.

What the other side says

The province: "When supply gets tight, prices rise. Rising prices attract investment in new generation."

What would settle it

Actual pool prices from 2028 on, and a system-wide cost estimate across all customer classes. The grid operator's 2026 Long-Term Outlook is due in Q4.

Sources 87884689

12AgainstEstimateThe build competes for the same tradesAlberta already faces a shortfall of up to 5,300 construction workers by 2030. Meta, its gas plant and Dow's Path2Zero are all building in the same region at the same time.5,300possible trades shortfall by 2030

In plain English

Thousands of electricians and pipefitters on a data centre aren't building homes, schools or plants. When everyone needs trades at once, costs go up for everyone.

What this means for Alberta families

When trades are scarce, a new home, a renovation or a new school can cost more and take longer. If you work in the trades, it cuts the other way: more demand for your work.

The record

BuildForce Canada (industry labour-market body): Alberta needs to add 48,800 construction workers by 2035, while 43,700 retire. Recruiting may leave "a shortfall of as many as 5,300 construction workers by the end of the decade."

In the same Industrial Heartland: Meta's campus (about 3,000 at peak), Greenlight (about 1,500 at peak) and Dow's Path2Zero (4,500 to 8,000 at peak, depending on the source), which is now delayed to late 2029.

For professionals

  • We found no primary evidence yet that data-centre construction is raising Alberta trades wages or costs. It's a pressure to watch, not a measured effect.
  • Local housing: Fort Saskatchewan and the northeast have lower rental vacancy than the Edmonton average (CMHC). We found no plan from Meta or the county for housing the construction workforce.

What the other side says

The province: data centre construction could become "one of the largest sources of trades work in the province for the next decade." For trades, demand is the upside.

What would settle it

Trades wage and cost data for the region through the build, and a construction-phase workforce and housing plan.

Sources 9065785

13AgainstOpen questionWhat if AI demand falls short?The spending is enormous and increasingly funded with debt. A gas plant built for 40 years is serving servers replaced every 3 to 5 years.$125–145BMeta's 2026 capital spending guidance (US$)

In plain English

If the AI boom cools, the servers go quiet, but the gas plant, the grid upgrades and the county's budget plans stay.

What this means for Alberta families

If AI demand cools, the county budget and the grid are left built around a customer that shrinks. Contract terms that put that risk on the builder protect households.

The record

Meta raised its 2026 capital spending guidance to "$125-145 billion." Its 2025 capital spending was $72.22 billion.

Microsoft said in 2025 it was "slowing or pausing some early-stage projects." Georgia's utility regulator staff found data centres "underperforming expectations due to a mixture of lower materialization rates, project cancellations, and delays."

The US Federal Reserve (May 2026) reported concern that AI "capital expenditures are increasingly funded by debt, creating leverage in the system."

The International Energy Agency's base case has global data-centre power use more than doubling by 2030, but its range is wide.

For professionals

  • Alberta's exposure: Greenlight is assessed to run for "at least 40 years"; Capital Power's supply deal runs 10+ years; the Data Centre Regulation expires in 2035. If a campus shuts early, the question is who pays for generation and grid built around it, and whether contracts include minimum-take or exit fees like Ohio's.

What the other side says

Meta is building with its own money and has broken ground. This is committed capital, not a speculative request.

What would settle it

Contract terms (minimum take, exit fees, decommissioning security) that put the downside on the builder, not the grid.

Sources 979853714431

Where it stands: The money going in is real and private. What comes back is the province's own count, not an independent one, and an independent estimate says power bills may rise first. We have found no independent, published study that settles it.61046

02Who wins, who pays

Follow the money, group by group.

The province

Gets

Royalties on the plant's gas, the data centre levy (net of the corporate tax it offsets), corporate income tax if profit is booked here. Its own total: about $250M a year of "benefits", with no breakdown.

Pays

No subsidy, grant or guarantee, by its own account. Carries the end-of-life risk if decommissioning security isn't required.105950

Sturgeon County

Gets

Up to $40M a year in property tax (the mayor's estimate) and about $60M of roads and water from Meta.

Pays

The service load of a 3,000-worker build. Depends more on one taxpayer.73672

Households

Gets

A transmission saving of about $13 a year on average (Pembina), up to 6% of the transmission line (province).

Pays

Higher energy charges: about $282 to $477 a year, 2027 to 2031 (Pembina estimate).4610

Businesses, industry, farms

Gets

A share of the transmission saving.

Pays

The same higher wholesale prices, on about 87% of the province's power use. No estimate published.8788

Gas producers

Gets

About 150 million cubic feet a day of new local demand.

Pays

Nothing extra.52

Power generators

Gets

Higher prices on existing plants. Capital Power: about $140M a year more per $10/MWh (as reported). A 10+ year, 250 MW contract with Meta.

Pays

Carbon costs on emissions above the benchmark.897175

Trades workers

Gets

About 3,000 jobs at peak on the campus, about 1,500 on the plant.

Pays

Nothing directly. Other builders compete for the same people.65790

Meta

Gets

A 1 GW campus with firm grid access and its own gas supply, with no provincial subsidy needed.

Pays

More than $13B up front, about $196.8M a year in transmission fees, the levy (deductible), property tax, and about $60M of local infrastructure.66210

Greenlight owners (Pembina, MSIP, Kineticor)

Gets

Pembina alone expects about $310M a year in adjusted EBITDA for its 47.5% share.

Pays

About $4.6B to build, and carbon compliance.52

First Nations

Gets

No disclosed equity in Meta's campus or Greenlight. Woodland Cree holds 51% of its own proposed project.

Pays

Wonder Valley's water licence is under judicial review brought by the Sturgeon Lake Cree Nation.8023

03Questions people ask

Everything else, answered.

51 questions, from the basics to the levy formula. Every answer says who each number comes from, and lines marked “our arithmetic” are ours.

The basics

What is being built, where, and how much of it is real.

What is an AI data centre, in plain terms?

A very large building full of computers that store and process data, and for AI, train and run AI models. They use a lot of electricity, and most of that ends up as heat that has to be removed.

Alberta's levy law describes the equipment inside as servers, racks, routers, cooling systems and related hardware used to process, store or transmit digital information.60

For scale, Meta's Sturgeon County campus sits on about 1,750 acres with about 2.9 million square feet of facility space, and is planned at about one gigawatt.662

Why do companies want to build them in Alberta?

The province's pitch is energy, a cold climate and stable rules, plus a large natural gas supply to run power plants.

The province lists Alberta's advantages as "energy, climate and stable rules".50 Alberta produces about 60% of Canada's natural gas, by the province's count.62

Its economic case is that private investors pay the whole cost and Albertans collect royalties, taxes, a levy, construction wages and infrastructure that stays.10 The rest of this page tests that case.

How many data centres are coming to Alberta?

Far fewer than the headlines suggest. Requests to connect add up to more power than Alberta has ever used, but the grid can only take a small slice of them.

As of July 30, 2026, about 19,565 MW of new data centre load was asking to connect to the grid. Alberta's all-time record demand is 12,785 MW, set on December 11, 2025. The province itself notes that requests are not approvals.62

The grid operator's interim limit for new large loads is 1,200 MW, and it is fully allocated.162 Roughly 37 other proposals have been told to find their own power off the grid.24

The province says plainly that "some announced projects will never break ground."50 For comparison, the province counts 22 named data centres operating in Alberta as of March 2025, mostly smaller commercial and telecom sites, and says that list is not complete.62

Which projects are actually being built?

One large AI campus is under construction: Meta's, in Sturgeon County north of Edmonton. The gas plant that will power it has also reached a final investment decision.

Meta broke ground on a campus it values at more than CA$13 billion.6 The Greenlight gas power plant beside it (932 MW, about $4.6 billion including financing) reached its final investment decision on July 2, 2026, with service expected in the second half of 2030.52

Smaller sites exist too, such as eStruxture's $750 million, 90 MW facility in the Calgary area.26 Others have been stopped: Rocky View County rejected a campus six to one,12 and the Alberta Utilities Commission rejected the power plant for the Synapse project at Olds.22

Is the "$100 billion" of investment real?

It is a goal, not money committed. The technology minister said in December 2024 that he hoped to see $100 billion of AI data centres under construction within five years.

The figure comes from the minister's statement.58 It is not money anyone has signed for.

Our arithmetic: the two projects actually committed, Meta (more than $13 billion) and the Greenlight plant (about $4.6 billion), add up to about $17.6 billion, roughly one-sixth of the goal.652

Does Meta's $13 billion include the AI chips?

No. By the province's own description, the $13 billion+ is the facility only, excluding the AI chips inside and the power plant beside it.

The province's numbers page makes the distinction.62 It matters for tax: property tax reaches the land, the building and the power plant, but not the computing equipment, which "can represent the majority of the cost of development."61 The levy is the tax that does reach the computing equipment.60

Did Alberta put public money into these projects?

Not directly. The province says it contributed "no subsidy, no grant, no discounted power and no guarantee" to the Meta project.

The province puts its financial exposure if a project fails at zero,50 and Meta is paying for about $60 million of local roads and water work.6

The open question is indirect cost: an independent estimate says household power bills could rise while the campus draws from the grid before its own plant is running.46 That is a cost to households, not a grant, and it is covered under Power bills below.

Money to government

Taxes, the levy, royalties and the $250 million.

How much money does Alberta get back?

The province says about $250 million a year from the Meta project, through royalties, taxes, levies and transmission fees. It has not published a breakdown.

The $250 million is the province's own figure; Meta's announcement gives no revenue number.106 Nobody independent has checked it.

The province says revenue on that scale "helps pay for healthcare, education and public safety without raising your taxes."10

What is actually inside the $250 million?

Four channels, none of them given a dollar figure. The one component the province does price elsewhere, Meta's transmission fees, is about $196.8 million a year on its own.

The province names royalties, the data centre levy, property taxes and lower shared grid costs.10 On a separate page it estimates Meta's transmission fees at about $196.8 million a year.62

It never says whether the $196.8 million sits inside the $250 million. Our arithmetic: if it does, royalties, levy and property tax together come to about $53 million a year, and the mayor's $40 million property tax estimate would be most of that.1062

The Pembina Institute reads the same figures differently, as $210 million a year to the province plus $40 million in property tax.46 Neither reading is confirmed by the province.

Are transmission fees the same thing as tax revenue?

No. Transmission fees pay for the power grid, not the provincial treasury. Albertans benefit through slightly lower transmission charges on their bills.

Large customers paying full freight shrink everyone else's share of the grid's fixed costs, so the transmission portion of household bills is expected to drop by up to 6% from Meta's fees.10 That is the transmission line item only, never the whole bill.62

The Pembina Institute puts that saving at about $13 per household per year on average.46

What is the data centre levy?

A new provincial charge of 1% to 2% on part of the value of a large data centre's computing equipment, starting with the 2026 calendar year.

It applies to data centres of 75 MW or more, from December 31, 2026, under Part 9.1 of Alberta's Corporate Tax Act (Bill 12).60 The province describes it as "up to 2 per cent on the value of their computing equipment."10

The rate slides between 1% and 2% depending on how much power the facility draws from the public grid.60 The exact formula is under For professionals.

If the levy is deductible, does it raise any money at all?

For a profitable company, little or nothing extra: the levy is credited against Alberta corporate income tax. For a company that is not yet profitable, it can end up as a real cost.

The province says the levy is "fully deductible against corporate income taxes paid in Alberta."10 Alberta's rural municipalities association put it this way: once a data centre is profitable and paying corporate income tax, the levy will not add to its tax bill.61

The credit is not refundable and carries forward seven years. Law firm Gowling WLG notes that data centres often run tax losses for years because of accelerated depreciation, so the credit can expire unused, "effectively rendering the levy a final tax."60

The provincial budget books $102 million from the levy, province-wide, starting in 2028-29.59

Does the levy go down if a data centre makes its own power?

Yes. The rate depends on how much power comes from the grid, and the 2026 budget plans a zero rate for power not drawn from the grid.

The levy rate varies between 1% and 2% with the share of grid power.60 Budget 2026 says power not drawn from the grid is to be eligible for a zero per cent rate.59

Our reading: once the Greenlight plant is running (expected in the second half of 2030),52 Meta's levy could fall. The two rules pull in opposite directions: the province wants self-supplied power, and self-supplied power pays less levy.

How much property tax will the host county get?

Sturgeon County's mayor has estimated upwards of $40 million a year. The estimate's basis hasn't been published, and property tax does not reach the computing equipment.

The province cites the mayor's estimate, which would make Meta one of the largest taxpayers in the county.10

Alberta Municipalities says land, the building, power generation, cooling and electrical systems are assessable, but "the computing equipment is not subject to assessment, and can represent the majority of the cost of development."61

Data centres over 75 MW, or able to connect to the grid, are assessed by the province as designated industrial property. The municipality collects the tax.6110

Do data centres pay royalties?

Not themselves. The royalty is on the natural gas their power plants burn, and it is paid by gas producers when the gas is produced.

The plant serving Meta's campus will burn about 150 million cubic feet of gas a day.1052 The province counts royalties on that gas as a benefit of the project.10

Our research desk's arithmetic, from Alberta's 2025 average gas reference price and royalty rules: at 2025 prices, the royalty on that much gas is roughly $4 million a year. At much higher gas prices it would be several times that. It is only new money to the extent the plant's demand adds to Alberta's gas production, and it starts only when the plant runs, expected in the second half of 2030.52

Will this money pay for healthcare and schools?

Money that reaches the provincial treasury goes into general revenue like any other tax, so in that sense yes. The amounts are small next to what oil and gas brings in.

The province says the revenue helps pay for healthcare, education and public safety.10

For scale, the budget books $102 million a year from the levy, province-wide, from 2028-29. Alberta's non-renewable resource revenue was $21,986 million in 2024-25.59 Our arithmetic: the levy is about half of one per cent of that.

Jobs

How many, what kind, and for how long.

How many jobs will the Meta campus create?

More than 3,000 construction workers at the peak of the build, and more than 300 permanent jobs once it runs.

Both figures are Meta's and the province's, not independently verified.610

The gas plant beside it adds its own: the province says about 1,000 construction jobs and 30 long-term positions,56 while the province's major projects register says about 1,500 workers at peak.57 The sources disagree, so we show both.

What kind of jobs are they, and do they pay well?

Construction is trades work. The permanent jobs are technicians, network engineers, electricians, security and facilities staff. No wage figures have been published.

The province lists the construction trades as "electricians, pipefitters, crane operators, concrete crews, engineers," and calls the permanent roles "high-paying, mortgage-paying careers" that "sit outside the oil and gas cycle."10

We have found no published wage figures for these roles, from Meta or the province.

Why so few permanent jobs for so much money?

Most of the money goes into buildings and equipment, not staff. Our arithmetic: about $43 million of investment per permanent job at Meta's campus.

Our arithmetic: $13 billion divided by 300 permanent jobs is about $43 million per job.6

The province answers the criticism directly: the 300 are good jobs, they cost taxpayers nothing, "and that's only the direct jobs."10 At the August 2026 town hall the minister said, "If we have a choice between 300 jobs and zero jobs, I'm taking 300 jobs all day long."11

Will the jobs go to Albertans, or to local people?

Nobody has promised that in writing. We have found no published local-hire commitment for the Meta project.

Local hiring targets with annual public reporting are one of the questions this site suggests residents ask at council.

What about spin-off and supply-chain jobs?

The province says there will be many, but no source puts a number on them.

The province names Alberta companies it expects to benefit, CoolIT Systems, Silent-Aire, Denvr and CES Corporation, and compares the pattern to oil sands maintenance work.10 The minister said data centres create "orders of magnitude more jobs that are supporting that supply chain."11

We have found no independent count of indirect jobs from Alberta data centres.

Won't AI itself take away jobs?

Residents raised this at the town halls. The province's answer is that AI will change work whether or not Alberta hosts the data centres.

One resident asked for a cost-benefit study that includes "job loss from the expansion of AI."11 The province says hosting the infrastructure does not change AI's effect on jobs either way; it only decides whether Alberta captures the investment and revenue.10

We have found no Alberta-specific study of either effect.

What happens to the construction workforce when the build ends?

Most of those jobs end. The host community carries the pressure on roads, housing and emergency services during the build years.

Meta has committed about $60 million to local roads and water infrastructure.6 We have found no published agreement with the host municipality covering the construction years (housing, policing, ambulance calls).

The province argues the next projects will keep trades busy, making data centre construction potentially "one of the largest sources of trades work in the province for the next decade."10 That depends on how many projects actually get built.

Power bills & the grid

What happens to your bill, and who pays for the wires.

Will my power bill go up?

Possibly, for a few years. The Pembina Institute estimates the average household could pay $267 to $462 more a year from 2027 to 2031. The province says the transmission part of bills goes down.

Pembina estimates the increase at 15% to 25% of the average bill. The same report finds a transmission saving of less than $20 a year.46 The average Alberta household spent about $1,700 on electricity in 2025.46

The province says the transmission portion of bills drops by up to 6% from Meta's fees.10 Both can be true: they measure different parts of the bill.

Pembina's figure is a modelled estimate, and the actual effect will depend on each household's retailer and rate plan.46 Real bills from 2027 on will show which way it went.

If data centres bring their own power, why would bills rise at all?

Because the timing doesn't line up. The rules let a data centre run on the public grid while its own power plant is still being built.

Meta's campus is expected to run on grid power first; its Greenlight gas plant isn't due until the second half of 2030.4652 Extra demand on the grid before new supply arrives pushes up the energy part of everyone's bill.46

Under the Data Centre Regulation, a "bridged" site can run on grid power for up to three years while its plant is built, and bringing your own power is optional.44

Pembina's summary: the rules make data centres pay for their grid connection and new supply, "but they don't protect consumers from the higher rates caused by increased electricity demand before that new supply comes online."46

How much power will Meta's campus use?

About 970 MW in its first phase, rising to about 1,800 MW at full build-out. The Pembina Institute says that is almost as much power as Calgary uses.46

The province lists three different numbers that are easy to confuse: 970 MW is Meta's approved grid allocation, 932 MW is the Greenlight plant's capacity, and 1,800 MW is the campus draw at full build-out.62

Our arithmetic: 970 MW is about 7.6% of Alberta's all-time record demand of 12,785 MW.62

Who pays for the grid connection and new transmission lines?

The data centre pays for its own connection. Who pays for larger, shared grid upgrades is still being decided.

Alberta's 2025 electricity law (Bill 8) assigns the cost of transmission upgrades a data centre needs to the data centre, not only to ratepayers.60 Pembina agrees the rules make new data centres "pay the full cost of their grid connection."46

How the cost of bulk, system-wide upgrades is shared is part of the grid operator's next large-load process. Other places have set firmer rules; see How do other places make data centres pay? under For professionals.

What does "bring your own power" actually mean?

A data centre builds or contracts its own generation, called "tethering", instead of relying on the public grid. In Alberta it is encouraged but optional.

The Data Centre Regulation (Alta Reg 117/2026) makes tethering optional. Choosing it gets a project a faster place in the connection queue.4421 A bridged site can use grid power for up to three years while its own plant is built.44

Law firm Bennett Jones has a plain-language summary of the framework.47

Could data centres cause blackouts in a cold snap?

Alberta's rules put homes first: if the grid has to shed load, data centres of 75 MW or more are cut before anyone else.

Bridged sites are cut earlier still, as soon as the grid operator decides supply will be inadequate.44 The rule covers data centres of 75 MW or more, and the whole regulation expires on May 31, 2035.44

The province says the grid operator connects projects only within what the system can reliably carry, rather than building ahead of speculative demand.50

Is the grid big enough for all of these proposals?

No. The grid operator has said it cannot connect everything that has been proposed.

The interim cap of 1,200 MW is fully allocated to two Edmonton-area pathways: about 970 MW for Pembina and Meta, and about 230 MW for TransAlta at Keephills.24 The rest have been told to supply their own power.244

Requests to connect, about 19,565 MW as of July 2026, are more than Alberta's record demand.62

Where will Meta's power actually come from?

The public grid first, then a 250 MW supply deal with Capital Power, and eventually the 932 MW Greenlight gas plant.

Capital Power has a supply agreement with Meta for 250 MW for more than ten years.62 Greenlight is expected in service in the second half of 2030.52

Meta says its electricity use will be "matched with 100% clean and renewable energy."6 Our reading: "matched" usually means buying renewable power or credits elsewhere to offset use, not that the campus physically runs on renewables. Meta has not said how it will match it in Alberta.

Risk & what's left behind

Who carries the loss if it goes wrong.

Who pays if a data centre fails, or the AI boom ends?

The investors, says the province: they "pay 100 per cent of the costs and carry 100 per cent of the risk." Critics point to what is left behind.

The province puts Alberta's exposure at the revenue it would stop collecting, which is revenue it never had before the project existed.50 It also says the buildings, power plants and fibre stay in Alberta regardless.10

The other side: buildings and power plants that stay can be assets or liabilities. Data centre equipment is typically replaced every three to five years, and abandoned hyperscale sites are hard to repurpose.27

Who cleans up a data centre at the end of its life?

The company that built it is responsible. Regulators can require money up front to guarantee that, but are not required to.

The province: "when any facility reaches the end of its life, the company that built it is responsible for decommissioning it. Regulators can require financial security for that obligation."50

Alberta's own history is why people ask. The province holds $1.8 billion in security for oil sands mines against an estimated $51.9 billion reclamation liability.43 Several US counties now require a decommissioning bond before construction.394041

What happens to the gas plant if the data centre leaves?

Nobody has said. The plant is built to run for decades, much longer than the computers it powers.

Greenlight's federal assessment assumes an operating life of at least 40 years.53 The computing equipment is typically replaced every three to five years,27 and the Data Centre Regulation itself expires in 2035.44

The province says new power plants keep "adding supply that serves Alberta whoever the customer is."50 Whether a plant built for one customer can sell to the grid if that customer leaves is one of this site's open questions.

What happens when the Data Centre Regulation expires in 2035?

It must be reviewed by May 31, 2030, and it expires on May 31, 2035. What replaces it hasn't been decided.

That regulation holds the rule that cuts data centres before homes in a supply emergency, and the bridging and tethering rules.44 Projects built today will outlast it.

Do proposals that never get built cost Albertans anything?

Not in public money, says the province, because it spends nothing on announcements.

"A proposal that dies costs Albertans nothing, because Alberta spends nothing on announcements."50

Our reading: dead proposals still cost communities time and money in hearings, and can hold up grid planning, but nobody has put a number on that.

Communities

Local say, local benefit, and First Nations.

Can a county say no to a data centre?

Yes, and one already has. Rocky View County council voted six to one against a data centre campus in September 2025.

After a 10-hour hearing where more than 50 residents spoke against it and four in favour, council rejected the roughly 448-hectare (1,100-acre) Kineticor campus.129

Rocky View then became the first Alberta community to pause data centre applications,13 and has since tightened its rules for them.51 Zoning and local consent now decide as much as power does.

What are residents most worried about?

Water, noise, farmland and emissions came up again and again at the province's town halls, along with whether 300 permanent jobs are worth it.

"Multiple speakers questioned whether 300 permanent jobs were worth all the concerns."11 A University of Calgary researcher said communities "aren't sure of the economic benefit it will bring."11

What does the host community actually get?

Property tax, local road and water upgrades, and community grants, plus construction activity during the build.

At Sturgeon County: the mayor's estimate of $40 million+ a year in property tax,10 about $60 million of roads and water infrastructure paid for by Meta,6 and Meta's Community Action Grants program for local non-profits.10

We have found no published host-community agreement setting out these commitments in a form the county can enforce.

Once a data centre is the biggest taxpayer in the county, can council still say no to it?

Legally yes. Practically, it gets harder, which is why residents are asking for commitments in writing before approval.

The province expects the Meta project to be "one of the largest taxpayers in the county."10 Our reading: a council that depends on one ratepayer has less room to push back on later expansions or rule changes.

What about First Nations?

The Sturgeon Lake Cree Nation is in court over the water licence tied to Wonder Valley. The levy law also exempts some computing equipment owned by Indigenous people on reserve lands.

The Nation says the licence was granted without proper consultation. The court dismissed O'Leary Digital's bid to strike the case on August 13, 2026, and it goes to a King's Bench hearing.2315

Bill 12 contains exceptions to the levy for certain computing equipment owned by Indigenous persons situated on reserve lands.60

Did Wonder Valley need an environmental impact assessment?

No. The province did not require a provincial environmental impact assessment for it.

That decision is a central thread in the local pushback.14 Wonder Valley is still an early-stage announcement, not a construction start.

A project is proposed near me. How do I have a say?

Land-use changes go through your municipal council, with public hearings. That is where Rocky View residents stopped a campus.

Come with specific questions: jobs in writing, the water number, the noise level at your house, and money posted for cleanup. This site has a list ready to take to the microphone.

Compared with oil & gas

What comes back, next to what Albertans are used to.

How does a data centre compare with an oil sands mine of the same size?

Per dollar invested, a large oil sands mine pays the province several times more, even in its early low-royalty years. But the two are not the same kind of deal.

Fort Hills cost between $16.5 and $17 billion,100 close to Meta's campus plus its gas plant. It paid $239.0 million in royalties in 2023, $299.2 million in 2024 and $220.2 million in 2025, all before it reached payout, the point where the higher royalty rate starts.99

Our arithmetic, illustrative only: Fort Hills' 2025 royalties come to about $13 million a year per billion dollars invested. For Meta, if the $196.8 million in transmission fees sits inside the province's $250 million, the treasury share is about $53 million, or about $4 million per billion invested.6210 If it doesn't, the comparison can't be done, because the province gives no breakdown.

Why isn't that a fair comparison?

Because a royalty is the price of selling something Albertans own, once. A data centre sells computing, not an Alberta resource.

Oil sands royalties partly reflect Albertans selling an asset they can never sell again. A data centre uses land, power and water but sells nothing Alberta owns.

Timing matters too. A mine past payout pays far more: Horizon, a mature oil sands mine, paid $1.16 to $1.51 billion a year in royalties from 2023 to 2025.99 And commodity prices swing, so any comparison has to state the year.

So what does come back, if not royalties?

Taxes, the levy, grid fees, wages and local spending. The honest answer is that nobody has published how much of each.

The province's own list is royalties on the gas, a levy on computing equipment, property taxes "for decades" and construction jobs.10 The only royalty involved is on the gas the power plant burns.10

We are not going to invent a comparison we can't source. The province could settle it by publishing the $250 million line by line.

For professionals

Formulas, regulation sections and other jurisdictions.

How is the data centre levy calculated?

Levy = (E + F) × R, where E is 45% of the cost of computing equipment under four years old, F is 15% of the cost of older equipment, and R is 1% to 2% depending on grid draw.

Corporate Tax Act s. 92.3(7). Worked example from Gowling WLG: $10,000 of new equipment in 2026 at the 2% rate pays $90 a year (0.45 × $10,000 × 2%) for its first three years, then $30 a year once it is four years old (0.15 × $10,000 × 2%).60

The 75 MW threshold is tested on total facility capacity, so a tenant using 10 MW in a 100 MW co-location facility is caught.60 The credit against Alberta corporate income tax is non-refundable and carries forward seven years.60 Budget 2026 plans a zero rate for power not drawn from the grid.59

Why do the Meta power numbers disagree: 932, 970 or 1,800 MW?

They measure different things. 932 MW is the Greenlight plant's nameplate capacity, 970 MW is Meta's approved grid allocation, and 1,800 MW is the campus draw at full build-out.

The province's own numbers page separates them.62 The $196.8 million transmission fee estimate assumes 970 MW of demand transmission service at a 90% load factor and the grid operator's default pool price.62

How do other places make data centres pay their share?

Several US utilities make large data centres commit to paying for most of the power they reserve, whether or not they use it, and post collateral.

Ohio (AEP Ohio): data centres pay for 85% of contracted power for 12 years, with an exit fee of three years' minimum charges.31 Kansas (Evergy): an 80% minimum bill plus collateral of two years' bills.32 Georgia: customers of 100 MW or more pay for upstream generation and transmission.33

All three still compete for data centres. Alberta has no minimum-take or collateral rule yet.

How much should I trust the numbers on this page?

Look at who each number comes from. Most of the benefit figures come from the province or Meta, who have an interest. The main cost figure is a think tank's modelled estimate.

Meta's investment and job figures are the company's own. The $250 million and the property tax estimate come from the province and the county mayor.610 The power bill estimate is the Pembina Institute's model, with stated assumptions.46 Lines marked "our arithmetic" are simple sums of cited figures.

We have found no independent, published cost-benefit study of data centres in Alberta.

What would settle the debate?

Three things: the province publishing the $250 million line by line, an independent cost-benefit study, and real power bills after 2027.

The $250 million broken into royalties, levy after the tax credit, property tax and transmission fees, and a clear statement of whether the $196.8 million in fees is inside it.1062

An independent cost-benefit study before any public incentive, as residents have asked for.11 And Pembina's bill estimate checked against actual bills once the campus is drawing power.46

Our reading: the one comparison that would do the most is the province's yearly benefit against the total yearly cost to households of any bill increase. Both are annual dollar figures. We will publish it only once every input is sourced.

See every source on Citations, and where projects stand on the tracker.

04When the money moves

The costs and the benefits don’t arrive together.

Estimated bill increases start in 2027. The campus starts running in 2028 or 2029 on existing grid power, including 250 MW from Capital Power's existing plants. The data centre levy first shows up in the budget in 2028-29. The campus's own new gas plant isn't due until the second half of 2030.

  1. Dec 2024MilestoneTech minister says he hopes to see $100 billion of AI data centres under construction within five years.58
  2. 2026RuleFirst levy year: computing equipment in service at year end is charged.5960
  3. May 2026MilestoneSite grading begins on Meta's campus.67
  4. Jun 9, 2026RuleData Centre Regulation filed: optional tethering, bridged sites cut first.44
  5. Jul 2, 2026MilestoneGreenlight gas plant final investment decision, about $4.6 billion.52
  6. Jul 8, 2026MilestoneMeta breaks ground in Sturgeon County, more than $13 billion.6
  7. 2027–2031CostPembina's estimated household bill increase: $267 to $462 a year.46
  8. 2H 2028MilestoneCapital Power starts supplying Meta 250 MW from its existing fleet, for 10+ years.71
  9. 2028 to 2029MilestoneMeta's campus starts operating. Sources differ: "Operational by 2028" (county) vs "2026 - 2029" (register).67
  10. 2028-29BenefitFirst data centre levy revenue in the provincial budget: $102 million, province-wide.59
  11. 2030CostAlberta's industrial carbon price reaches $115 a tonne, under the Canada–Alberta agreement.76
  12. May 31, 2030RuleData Centre Regulation must be reviewed.44
  13. 2H 2030MilestoneGreenlight expected in service. Until then the campus relies on the grid.5246
  14. 2035CostCarbon price reaches $130 a tonne.76
  15. May 31, 2035RuleData Centre Regulation expires.44

05Per megawatt

Every project, on one yardstick.

Each project’s own figures, divided by its size so they can be compared. The one hyperscale campus actually building states about 30 permanent jobs per 100 MW. Proposed projects claim more. Promises made before construction deserve a discount.

ProjectStatusSizeInvestmentConstruction jobsPermanent jobsInvestment per MWour arithmeticPermanent jobs per 100 MWour arithmeticWhose numbers
Meta, Sturgeon County667Building1,000 MW$13B+~3,000 at peak300+$13M30Meta
eStruxture CAL-3, Rocky ViewA colocation site, much smaller than a hyperscale campus.2681Building90 MW$750M~250 at peak45 to 50$8.3M50 to 56eStruxture
Beacon Heartland, Sturgeon CountyCounty master development permit issued; own gas generation.81Approved800 MWn/a1,500+up to 300n/aup to 38Beacon
Beacon Foothills, High River81Proposed400 MW$4.0Bn/a300$10M75Beacon
Synapse, OldsThe AUC rejected its power plant in Aug 2026.822255Proposed1,000 MW$10B2,0001,000+$10M100+Synapse / Town of Olds
Wonder Valley Phase 1 (O'Leary)No jobs figure published. Under judicial review.8123Proposed1,400 MW$12.0Bn/an/a$8.6Mn/aO'Leary Digital
TNE / Data District Phase 1782Proposed240 MW combined$1.26Bn/aOlds: 70 by end of 2026, ~150 by 2029-30n/an/aTNE / Town of Olds
Mihta Askiy (Woodland Cree, 51%)The one project with majority Indigenous ownership.80Proposed650 MW gasn/an/an/an/an/aProponent
Greenlight gas plant (serves Meta)Generation, not a data centre. Sources disagree on jobs.52565774Building932 MW~$4B capex, ~$4.6B with financing1,000 (province) to 1,500 at peak (register, federal filing)30 (province) / 40+ (federal filing)~$4.3M capexn/aProvince / proponent
Capital Power supply to MetaFrom the existing fleet, 10+ years, from 2H 2028. Adds no new generation.71Contract250 MWn/an/an/an/an/a